DESIGN OF STABLE SLOPE FOR OPENCAST MINES
the mining operation. Design of the final pit limit is thus governed not only by the ore grade distribution and the production costs, but also by the overall rock mass strength and stability. The potential for failure must be assessed for given mining layouts and incorporated into the design of the ultimate pit.